UPDATE - SEPTEMBER 12, 2011
The framework for the CKCA sign was placed on the roof last week.
Crews are installing the railing around the grand staircase and have started work on the roof pop up over the theatre space. By the next time I report the roof should be just about complete. Fans of construction will be treated to a view of the steel placement as the roof steel will be picked up on 104 Ave and stretched over top to the building before being placed down on the south side. It should be quite spectacular.
Work continues with electrical and mechanical on all floors.
|