Building Permits

Please be advised that sump pit and solar ready requirements are now mandatory on all new residential construction.  Should you have any questions regarding this, please feel free to contact our building department.

Application for a Building Permit (76 KB)
Application for a Sign Permit (44 KB)

Common Questions About Building Permits

When do I need a building permit?

A building permit is required for all new construction, repair, reconstruction or alteration, addition, removal of a portion of a structure, wood stove, mobile home installation and for demolition.  (A building permit is required for a shed larger than 100 sq. ft.)

What do I need to obtain a building permit?

You will require a complete set of drawings showing site plan, wall elevations, floor area and sectional views. For new construction, plans must include mechanical, electrical, plumbing and the type of occupancy intended.  Application must be made to the Homeowner Protection Office before applying for a Building Permit.

Homeowner Protection Office Branch of BC Housing
650 – 4789 Kingsway
Burnaby, BC  V5H 0A3
1-800-407-7757
www.hpo.bc.ca

How long does it take to get a building permit?

It depends on the time of year and the scope of the project.  The summer months are the busiest time of year.  It is recommended that you apply for a building permit a minimum of two weeks before the start of the project.

How much does a building permit cost?

Fees vary based on type and value of project:

PERMIT FEES AND INSPECTION CHARGES

BUILDING CONSTRUCTION FEE
Minimum Building Permit Fee (includes wood burning appliance) $60.00
When the value exceeds $1,000.00 but does not exceed $2,000.00 $75.00
When the value exceeds $2,000.00 but does not exceed $5,000.00 $95.00
When the value exceeds $5,000.00 but does not exceed $10,000.00 $115.00
When the construction values exceeds $10,000.00, an additional fee of $7.50 for each and every additional $1,000.00 or fraction thereof up to and including $50,000.00 shall be paid  
When the construction value exceeds $50,000.00 the fee will be $415/permit plus an additional $6 for each and every $1,000 or fraction thereof shall be paid  
Plan Processing Fee $115.00
Re-Inspection Charge $75.00
Inspection outside of regular working hours $75.00
Voluntary inspection $75.00
No Building Permit (Fee for beginning construction without first obtaining a building permit) $125.00
PLUMBING INSTALLATIONS FEE
Plumbing Permit-Authorized plumbing work which consists of installing, altering and extending not more than 1 fixture $60.00
For each and every additional fixture (more than one) to be installed or altered, an additional $6.00 per fixture shall be charged  
For 11 fixtures the price is $120.00
For every additional fixture thereafter an additional fee $3.00
For the installation of sprinkler heads, the cost of the sprinkler shall be
$12.00
For the installation of additional sprinkler heads – up to 100
$0.60
For the installation of additional sprinkler heads in excess of 100
$0.25
MOVING PERMITS WITHIN CITY LIMITS FEE
Moving any building of any size $300.00

Provided that:Every application for a Building Moving Permit shall be accompanied by an irrevocable letter of credit established in favour of the City for a sum of not less than $10,000, which letter of credit will expire not less than one year from the date of application for the Building Moving Permit and which letter of credit is to secure the obligations of the applicant, such obligations to include:

Property from which the building is being removed:

  • environmental cleanup if required;
  • remove all debris including foundation material;
  • lot to be left in condition for reconstruction and ease of maintenance.

Property onto which the building is to be placed:

  • proper drainage provisions;
  • landscaping;
  • such improvements to siding, windows, roof or other aspects of the building which may be required as a condition of granting the Building Moving Permit.
DEMOLITION FEE
Demolition Permit for commercial or industrial building (each) $300.00
Demolition Permit for residential building $75.00

 

How long is a building permit valid for?

A building permit is valid for a period of one year from the date of issuance.

How do I get an electrical or gas permit?

You must contact the British Columbia Government Agent 250.784.2224 for the applicable applications and permits.

At which stages do I require an inspection?

The owner or builder must contact the Building Inspector at 250.784.3658 a minimum of 48 hours before the inspection is to occur.

Inspections are required for the following stages:

  • Footings before concrete is placed.
  • Foundation before backfill is placed.
  • Dampproofing, drain tile, drainrock.
  • Insulation, vapour barrier.
  • Final, occupancy.

NOTE: It is the responsibility of the owner or builder to ensure that other inspections such as electrical, gas connection, plumbing, water and sewer connection are carried out at the appropriate times.

When is a building permit considered complete?

A building permit is complete when all aspects of the plan submitted for the permit have been completed.  In the case of a new building, an Occupancy Permit will be issued only when all inspections are complete and satisfactory including a legal survey certificate and all Engineer reports (if applicable) are submitted.

If you require further information please contact:

Gary Fellows, Chief Building Inspector 250.784.3658

Devon Bacon, Building Inspector 250.784.3654


 City of Dawson Creek 2012 Building Permit Totals

TOTALS  1,173,971.00 (10)  4,295,000.00 (4) 50,000.00 (1)   207,000.00 (1)   16
MONTH RESIDENTIAL COMMERCIAL INDUSTRIAL

INSTITUTIONAL
(Schools, Hospital, etc.)

GOVERNMENT TOTAL # PERMITS
January  666,051.00 (4)  880,000.00 (1)        5
February  257,786.00 (2)  275,000.00 (1)  50,000.00 (1)    207,000.00 (1)  5
March  250,134.00 (4)  3,140,000.00 (2)        6
April            
May            
June            
July            
August            
September            
October            
November            
December            

2012 Total # of permits issued: 16

2012 Total # of new dwelling units created: 7

City of Dawson Creek 2011 Building Permit Totals

TOTALS 17,125,883.00 (95) 6,696,538.00 (17) 10,015,591.00 (10)  2,663,984.00 (3) 12,931,295.00 (8)  133
MONTH RESIDENTIAL COMMERCIAL INDUSTRIAL INSTITUTIONAL
(Schools, Hospital, etc.)
GOVERNMENT TOTAL # PERMITS
January 1,783,066.00 (7) 135,000.00 (1)       8
February 1,180,668.00 (5) 104,000.00 (1)       6
March 302,000.00 (2)         2
April 2,584,067.00 (11) 732,000.00 (3)   2,663,984.00 (3)   17
May 2,136,393.00 (16) 1,117,000.00 (3)       19
June 2,927,599.00 (15)  1,250,000.00 (1)  1,040,000.00 (1)    879,700.00 (1)   18
July *1,502,423.00 (11)  420,000.00 (3)  1,482,591.00 (3)    6,010,000.00 (2)   19
August 792,402.00 (9)    3,400,000.00 (3)    564,795.00 (2)  14 
September 1,330,000.00 (5)  700,000.00 (3)  2,993,000.00 (2)    206,800.00 (1)   11
October 1,035,000.00 (7)        5,060,000.00 (1)   8
November 1,239,768.00 (5)  2,238,538.00 (2)  1,100,000.00 (1)    210,000.00 (1)   9
December 312,500.00 (2)           2

2011 Total # of permits issued: 133- $49,433,291.00

2011 Total # of new dwelling units created: 91


City of Dawson Creek 2010 Building Permit Totals

TOTALS 24,758,426.00 (110) 16,175,292.74 (24) 4,802,120.00 (6) 12,813,000.00(4) 594,100.00 (4) 148
MONTH RESIDENTIAL COMMERCIAL INDUSTRIAL

INSTITUTIONAL
(Schools, Hospital, etc.)

GOVERNMENT TOTAL # PERMITS
January 433,440.00 (3) 699,000.00 (2)       5
February 566,599.00 (3)         3
March 1,390,704.00 (7)     5,800,000.00 (1) 405,000.00 (2) 10
April 3,293,131.00 (13) 2,630,000.00 (3)       16
May 4,999,000.00 (9) 216,357.20 (2) 761,120.00 (1)     12
June 5,028,985.00 (19) 1,106,135.54 (2)   288,000.00 (1) 170,000.00 (1) 23
July 1,113,210.00 (12) 90,000.00 (2)     19,100.00 (1) 15
August 2,158,296.00 (11) 8,617,800.00 (4) 1,041,000.00 (2)     17
September 2,596,600.00 (16) 2,736,000.00 (7) 3,000,000.00 (3) 6,725,000.00 (2)   28
October 1,637,038.00 (8) 70,000.00 (1)       9
November 693,067.00 (6) 10,000.00 (1)       7
December 848,356.00 (3)         3

2010 Total # of permits issued: 148 – $59,142,938.74

2010 Total # of new dwelling units created: 153


City of Dawson Creek 2009 Building Permit Totals

TOTALS 19,674,305.00 (88) 8,174,354.23(18) 1,498,000.00 (7) 3,510,500.00 (4) 350,000.00 (1) 118
MONTH RESIDENTIAL COMMERCIAL INDUSTRIAL INSTITUTIONAL
(Schools, Hospital, etc.)
GOVERNMENT TOTAL # PERMITS
January 1,311,272.00 (3) 1,655,000.00 (2)       5
February 6,100.00 (2) 400,000.00 (1) 200,000.00 (1)     4
March 307,200.00 (2) 76,800.00 (2)       4
April 8,114,000.00 (4) 3,000,000.00 (1) 38,000.00 (1) 593,000.00 (1)   7
May 1,816,267.00 (11) 73,000.00 (3)       14
June 1,295,500.00 (12) 143,229.23 (2) 5,000.00 (1) 417,500.00 (2)   17
July 2,273,294.00 (9) 350,000.00 (1) 375,000.00 (1)     11
August 50,000.00 (3) 923,000.00 (1) 500,000.00 (1)     5
September 1,671,746.00 (17) 860,000.00 (2) 380,000.00 (2)     21
October 1,084,500.00 (10)     2,500,000.00 (1) 350,000.00 (1) 12
November 859,510.00 (8) 678,325.00 (2)       10
December 884,916.00 (7) 15,000.00 (1)       8

2009 Total # of permits issued: 118 – $33,207,159.23

2009 Total # of new dwelling units created: 96


City of Dawson Creek 2008 Building Permit Totals

TOTALS 11,466,132 7,623,700 921,000 300,000   118
MONTH RESIDENTIAL COMMERCIAL INDUSTRIAL INSTITUTIONAL
(Schools, Hospital, etc.)
GOVERNMENT TOTAL # PERMITS
January 280,000.00 (2)     300,000.00 (1)   3
February 528,750.00 (3) 775,000.00 (1) 75,000.00 (1)     5
March 903,061.00 (5)         5
April 185,000.00 (6)   10,000.00 (1)     7
May 1,647,000.00 (14) 1,058,500.00 (5)       19
June 1,949,500.00 (11) 500,000.00 (2)       13
July 494,218.00 (8) 454,000.00 (1)       9
August 1,146,910.00(12) 53,000.00 (2)       14
September 484,500.00 (4) 332,000.00 (4) 66,000 (1)     9
October 1,182,375.00(13) 4,200,000.00 (1) 770,000.00 (2)     16
November 1,678,000.00 (7) 1,200.00 (1)       8
December 986,818.00 (9) 250,000.00 (1)       10

2008 Total # of permits issued: 118 – $20,310,832.00

2008 Total # of new dwelling units created: 55


City of Dawson Creek 2007 Building Permit Totals

TOTALS 17,194,832 26,781,000 3,201,000 5,060,000 316,886 137
MONTH RESIDENTIAL COMMERCIAL INDUSTRIAL INSTITUTIONAL
(Schools, Hospital, etc.)
GOVERNMENT TOTAL # PERMITS
January 1,029,886 (5) 54,000 (2)       7
February 910,733 (3)   1,200,000 (1)     4
March 1,032,500 (6)   1,300,000 (1)     7
April 853,600 (6) 180,000 (2) 30,000 (1)     9
May 2,886,800 (22)   253,000 (1)     23
June 826,000 (11) 120,000 (1) 403,000 (2) 5,020,000 (2)   16
July 2,454,663 (11) 500,000 (1) 15,000 (1)     13
August 256,900 (10) 19,753,000 (3)       13
September 2,467,250 (17) 6,024,000 (5)   40,000 (1)   23
October 3,376,500 (15) 150,000 (2)       17
November 1,100,000 (4)       316,886 (1) 5
December           0

2007 Total # of permits issued: 137 – $52,553,718.00

2007 Total # of new dwelling units created: 151


City of Dawson Creek 2006 Building Permit Totals

TOTALS 13,393,268.24 19,981,933.00 2,095,181.00 464,324.00 1,544,000.00 130
MONTH RESIDENTIAL COMMERCIAL INDUSTRIAL INSTITUTIONAL
(Schools, Hospital, etc.)
GOVERNMENT TOTAL # PERMITS
January 1,106,098.94 (10)         10
February 8,400.00 (2)   419,431.00 (1)     3
March 15,000.00 (1) 8,061,933.00 (1)       2
April 2,303,133.00 (12)         12
May 1,583,905.00 (13) 4,100,000.00 (1) 190,000.00 (1) 439,324.00 (1)   16
June 442,191.00 (11) 6,585,000.00 (7)       18
July 1,582,092.00 (12) 350,000.00 (3)     1,544,000.00 (2) 17
August 2,436,153.00 (15)         15
September 2,097,849.30 (16) 390,000.00 (2) 1,485,750.00 (1)     19
October 684,614.00 (10) 470,000.00 (1)       11
November 653,226.00 (3)     25,000.00 (1)   4
December 480,606.00 (2) 25,000.00 (1)       3

2006 Total # of permits issued: 130- $37,478,706.24

2006 Total # of new dwelling units created: 51


City of Dawson Creek 2005 Building Permit Totals

TOTALS 7,065,674 6,312,300 252,000 200,000 34,792,000 102
MONTH RESIDENTIAL COMMERCIAL INDUSTRIAL INSTITUTIONAL
(Schools, Hospital, etc.)
GOVERNMENT TOTAL # PERMITS
January 150,255 (1) 7,500 (1)       2
February 2,000 (1)         1
March 217,927 (7) 1,925,500 (1)   100,000 (1)   9
April 511,184 (5) 63,000 (1) 252,000 (1)     7
May 960,925 (16) 812,000 (1)       17
June 945,683 (13) 36,000 (2)       15
July 1,543,642 (12) 910,000 (2)   100,000 (1) 3,570,000 (2) 17
August 1,264,959 (9) 79,800 (2)     31,100,000 (1) 12
September 230,847 (4) 2,127,000 (3)       7
October 499,410 (5) 281,500 (2)     122,000 (1) 8
November 582,842 (4) 70,000 (1)       5
December 156,000 (2)         2

2005 Total # of permits issued: 102 – $48,621,974

2005 Total # of new dwelling units created: 40


2004 Building Permit Totals – $14,906,548

2003 Building Permit Totals – $19,190,194

2002 Building Permit Totals – $8,387,279